< All Topics
Print

What is BOM(Bill of Material)

Bill of material is a one of the Production Planning master data which contains information like list of components and its quantity required to produce an assembly or FG.

Points to remember

  • Bill Of Material can be made only of Manufactured “Yes” item.
  • BOM can be made of Sub-Assembly and Finished good items only.

Steps for creating BOM

  • Log in to “Ease My Production” Software with login credentials.
  • Go to Manufacturing > Masters > Item.
  • Click on any item grid.
  • Click on “BOM” tab, next to Item details tab.
  • Click on Edit > Add item.
  • In the grid which is open, select the items.
  • Click on Done > Update.

Watch Video for detailed explanation

 

https://youtu.be/9JHusEKqgNw

 

https://youtu.be/9JHusEKqgNw

Tags:
Table of Contents