Bill of material is a one of the Production Planning master data which contains information like list of components and its quantity required to produce an assembly or FG.
Points to remember
Bill Of Material can be made only of Manufactured “Yes” item.
BOM can be made of Sub-Assembly and Finished good items only.
Steps for creating BOM
Log in to “Ease My Production” Software with login credentials.